Electric Vehicle (EV) Charger Application
Requirements
- The data and specifics of the proposed EV charger/receptacle.
- A location sketch of the proposed location of the EV charger/receptacle, including the height above the ground where the EV charger/receptacle will be installed.
- Electrical Permit Application (online)
Application Process
- Log into: https://www.citizenserve.com/northtopsailbeach
- Complete an electrical application:
- Mouse over “Services” tab in the top bar
- Click on "Permits"
- Click on "Apply online" in the left-hand column
- Select "Electrical Permit" in the drop-down menu
- Complete the application.
- Upload the EV specs and location sketch at the bottom of the application, in the "Supporting Documents" field.
- When complete click "submit"